Turnkey office fit-outs including civil, MEP, false ceiling, flooring, joinery, and complete workplace branding, executed by our in-house civil and engineering team for enterprises, co-working operators, and corporate headquarters. Global Capability Centres took 41.7% of India's office leasing in the first half of 2026, some 15.8 million sq ft (JLL, 2026). A GCC floor is fitted to a global parent's specification, audited against it, and handed over to a fixed date.

Corporate Offices, Office fit-outs including civil, MEP, false ceiling, flooring, joinery, and complete workplace branding for enterprises and co-working operators. Impulse Branding Solutions executes all work in-house, from fabrication at our Mumbai facility to site installation, with a single in-house civil and engineering team. Named clients include: GroupM, Canon, Epson, WeWork Mumbai.
Services We Deliver
Corporate Offices Branding & Fit-Out Services

Sector Challenges We Solve
What Makes Corporate Offices Projects Different
Coordinating Civil, MEP, and Branding Teams
Corporate office projects typically involve three separate contractors, civil, MEP, and a branding/signage vendor. Coordination between them is slow, rework is common, and accountability for punch-list items is unclear. IBS eliminates this by executing all three in-house.
Delivering Brand Environment as Part of Fit-Out
Most fit-out contractors hand over a bare finished space and leave brand graphics as an afterthought. IBS plans the brand environment, reception graphics, wall murals, wayfinding, and branded meeting room themes, as part of the original scope, not a retrofitted add-on.
Post-Pandemic Hybrid Workspace Design
Corporate clients need offices designed for hybrid working, collaboration zones, focus rooms, flexible seating, and video-conferencing infrastructure integrated from the start. Our project team has delivered hybrid offices for GroupM, Canon, and Epson.

Why Impulse Branding Solutions
Our Advantage in Corporate Offices
Civil + MEP + Branding: One Team
No coordination between contractors. Our civil, MEP, and branding teams work together under one project manager, faster delivery, cleaner handovers, and one point of accountability.
Enterprise Reference Clients
GroupM, Canon, Epson, and WeWork Mumbai (via sister company RKS Interior), enterprise-level delivery track record for clients who require process, documentation, and quality standards to match their brand.
Brand Environment as Standard
Reception signage, wall graphics, wayfinding, and branded meeting rooms are planned in the original scope, not added on as an expensive afterthought.

Frequently Asked Questions
Common Questions About Corporate Offices Projects
Has IBS delivered office fit-outs for named enterprise clients?
Yes. Corporate office clients include GroupM, Canon, and Epson. WeWork Mumbai offices were executed through our sister company, RKS Interior Pvt Ltd. Reference site visits can be arranged for qualified prospects.
Does IBS handle both the interior fit-out and office branding?
Yes. This is a key IBS differentiator. We execute the full fit-out (civil, MEP, false ceiling, flooring, partitions, joinery) AND the complete brand environment (reception graphics, wall murals, wayfinding, branded meeting room themes) under one contract.
What is the typical cost of an office fit-out per sq ft?
Standard office fit-outs from ₹1,200 per sq ft (basic specification). Premium finishes from ₹2,500 per sq ft. For enterprise-grade fit-outs with high-specification MEP and custom joinery, ₹3,500+ per sq ft. Quoted on BOQ basis after site assessment.
How long does an office fit-out take?
A standard 5,000 sq ft office fit-out typically takes 6–10 weeks from GFC drawing approval to handover. Larger offices (20,000+ sq ft) are project-planned with phased timelines. IBS does not begin any fit-out work without approved GFC drawings.
Does IBS execute MEP (mechanical, electrical, and plumbing) in-house?
Yes. Our in-house MEP team handles electrical (LT panels, wiring, lighting), HVAC (split, VRF, AHU), plumbing and sanitation, firefighting systems, and data infrastructure. All MEP is designed, procured, and executed by IBS, no external MEP contractor.
Can IBS design the office layout and 3D visualisations?
Yes. Our design team prepares space planning, layout drawings, 3D render visualisations, and GFC drawings. We work from your brief and brand guidelines. Design is included in the project scope.
Does IBS handle hybrid office design with collaboration zones?
Yes. Post-pandemic hybrid office design, open collaboration zones, focus booths, video-conferencing rooms, flexible seating, and breakout areas, are standard office design scope for IBS. We have delivered these for media and tech sector clients.
Can IBS execute a co-working space fit-out?
Yes. Co-working space fit-outs have specific requirements, high-density workstations, branded zones, flexible partitions, and hospitality-grade common areas. IBS has co-working fit-out experience from the WeWork Mumbai projects executed through RKS Interior.
Does IBS handle false ceiling systems for offices?
Yes. False ceiling installation, grid and tile systems, gypsum board ceilings, feature ceilings, and integrated lighting tracks, is a core part of our office fit-out scope. We coordinate ceiling design with MEP routing to avoid conflicts and rework.
Can IBS work in an occupied building while staff continue to work?
Yes. We phase fit-out works and implement dust, noise, and access controls to allow the rest of the building to continue operating. This is standard for floor-by-floor and phased office fit-outs in occupied commercial buildings.
What flooring options does IBS offer for corporate offices?
We offer vitrified tiles, carpet tiles (cut-pile and loop-pile), engineered wood flooring, vinyl planks, epoxy flooring for utility areas, and anti-static flooring for server rooms and data areas. All materials are sourced from reputed manufacturers and installed in-house.
Does IBS handle AHU and HVAC installation for large office spaces?
Yes. Our MEP team installs split AC systems, VRF (variable refrigerant flow) systems, AHU (air handling units), and ducted ventilation systems. We design the HVAC layout in coordination with the false ceiling and electrical plan to avoid clashes.
Can IBS source and install branded office furniture?
Yes. We source workstations, ergonomic chairs, conference tables, reception seating, and storage units from trusted manufacturers and handle delivery, installation, and assembly. Custom-branded reception desks and joinery pieces are fabricated in-house.
Does IBS install glass partition systems for offices?
Yes. Frameless glass partitions, framed glazed partitions, and acoustic glass systems are a standard part of our office fit-out scope. We specify glazing to the required acoustic and fire-rating for each zone.
What acoustic solutions does IBS provide for open-plan offices?
We provide acoustic ceiling panels, fabric-wrapped wall panels, suspended acoustic baffles, and acoustic glass partitions for open-plan offices. All acoustic specifications are calculated against the room dimensions and target noise levels required by the brief.
Can IBS handle a partial office refurbishment without a full fit-out?
Yes. Partial refurbishments, reception revamps, meeting room upgrades, kitchen and pantry upgrades, or a branding refresh without structural work, are accepted. We assess the scope and provide a targeted quotation without requiring a full fit-out contract.
What project documentation does IBS provide for corporate office fit-outs?
We provide: approved GFC drawings, material specifications and samples, MEP as-built drawings, statutory compliance certificates (electrical test certificate, fire NOC if applicable), a warranty register for all installed systems, and a final handover inspection report.
Does IBS handle data centre rooms and server room fit-outs?
Yes. Server room and data centre fit-outs require anti-static flooring, precision cooling, dedicated UPS power circuits, cable management systems, and fire suppression. IBS handles the civil and MEP scope and coordinates with IT infrastructure vendors for cabling and equipment.
How does IBS handle fire safety for corporate office fit-outs?
All office fit-outs are designed to meet NBC and local fire authority requirements, fire-rated partitions and doors in required zones, sprinkler and fire detection integration, emergency lighting, and clearly marked fire exit routes. We obtain the required fire NOC before occupation.
How do I get started with IBS for an office fit-out project?
Share the site details: floor plan, sq footage, floor plate, and any existing services drawings, and your brief (headcount, work style, budget range). We conduct a site visit, prepare a concept layout and BOQ-based quotation, and present both within 5–7 working days. No charges for the initial assessment.
What does a corporate office fit-out include?
Everything between a bare or warm shell and a working floor: demolition, partitions, false ceiling, flooring, glazing, the full MEP scope, joinery, furniture and brand environment, under one contract. IBS delivers this with in-house civil, MEP and joinery teams and furniture from its own factory. Its named office work includes GroupM in Mumbai and WeWork interiors delivered through sister company RKS Interior.
Bare shell versus warm shell
A bare shell is a structural envelope with no services: no flooring, ceiling, HVAC or electrical distribution. A warm shell has base services brought in and terminated, ready for a tenant to distribute. Which one you have changes a fit-out budget substantially.
What is a GFC drawing?
Good for construction: the final, coordinated drawing set a contractor builds from, as distinct from a concept or design-intent drawing. A firm line-item price cannot exist before GFC drawings do, only a budget estimate against stated assumptions.
Scope
What a corporate fit-out covers
The full scope carried under one contract, each line executed by an IBS team rather than a nominated subcontractor.
Civil and finishes
- Demolition and stripping of the existing fit-out, with site protection
- Blockwork and drywall partitions, including acoustic and fire-rated build-ups
- False ceiling in grid and gypsum, coordinated with services above
- Flooring: vitrified tile, engineered timber, carpet tile and vinyl
- Frameless glass partitions, doors and glazing with manifestation
MEP
- Electrical: DB panels, MCB and RCCB protection, cable trays, earthing to IS 3043
- HVAC: VRF and ducted systems, AHU and FCU installation, diffuser layout
- Plumbing to pantries and washrooms, with hydrotesting before concealment
- Fire: sprinkler layout, smoke detection and panel integration
- Low voltage: structured data cabling, access control, CCTV and AV back-boxes
Workplace and brand
- Workstations and desking manufactured at the Vasai East factory
- Conference tables, storage and case goods built to the drawing
- Reception counter and feature wall, coordinated with the signage scope
- Meeting room, phone booth and collaboration space joinery
- Wayfinding, reception logo wall and interior brand graphics in the same contract
What you receive at handover
- Joint snag walk, snags listed, dated, closed and photographically evidenced
- As-built drawings plus commissioning and test records for HVAC, electrical and fire
- Warranty certificates with manufacturer pass-throughs collated in one file
- Signage workmanship warranted 12 to 24 months; fit-outs carry a stated defect liability period
- A named IBS contact for that period, holding the original drawings and spares
Commercials
How the work is priced, specified and verified
The parts of a quotation that decide whether the number you compare is the number you pay, and the named components behind the specification.
How a price is built
- A line-item BOQ against a stated scope, not a rate per square foot
- Component brands named on the BOQ rather than written as a generic line
- Provisional sums identified as provisional, not folded into a rate
- Written assumptions, so you can see which one moved if the number changes
- Variations agreed in writing against the original BOQ before work proceeds
- RA bills raised against measured work completed, not elapsed calendar time
Named components we specify
- LED and drivers: Nichia-class modules with Mean Well or Schneider drivers, IP65 outdoors
- Films and wraps: 3M and Avery Dennison cast media
- Electrical: Havells, Legrand and Schneider switchgear, MCB and RCCB protection
- HVAC: Daikin, Blue Star and Voltas VRF and ducted systems
- Plumbing: Astral and Supreme CPVC and UPVC, Jaquar fixtures
- Boards and laminates: Gyproc and Saint-Gobain partitions, Merino and Greenlam surfaces
What to check in any quotation, ours included
- Is the driver brand named, or does the line just say "LED driver"? That is the component that fails first and the one most often substituted downward.
- Is the defect liability period stated in months, and does it start at handover or at practical completion?
- Does the price assume access you actually have, and what happens to it if the access window changes?
- Who is the named project lead, and how many other jobs are they running at the same time?
- Are spares held against your specification, or bought nearest-match when something fails?
- On a multi-site programme, how will you be shown that site 140 matches site 1 without visiting both?
How quality is verified
- Colour proofed against one approved physical swatch under controlled lighting
- Factory QC on every unit before dispatch from the Mumbai facility
- Hydrotesting on plumbing and pressure tests on sprinkler lines before concealment
- Earthing verified to IS 3043; electrical installation to IS 732
- Snag list walked jointly, closed and re-inspected with photographic evidence
- As-built photographs of every installed location on a multi-site programme
Taking a new floor?
Send the floor plate, tell us bare or warm shell, and give us your occupation date. You get a line-item BOQ and a programme worked backwards from that date.
Scope an office fit-outBare shell against warm shell
The single biggest variable in a corporate fit-out budget, and the one most often unclear when a quotation is requested.
| Bare shell | Warm shell | |
|---|---|---|
| What exists | Structure, core and external envelope only. | Base HVAC, electrical and fire brought in and terminated. |
| Your scope | All services from the incoming point. | Distribution from the termination point onward. |
| Programme impact | Longer: services first fix is a large early package. | Shorter: first fix starts from a served floor. |
| Typical driver of cost | MEP is the dominant line. | Finishes and joinery dominate. |
| What to confirm first | Incoming load, riser capacity, chiller availability. | Termination points and whether base capacity suits your density. |
Market Context
What the published data says
- India’s office furniture market was valued at USD 6.26 Billion in 2025, forecast to USD 14.12 Billion by 2034 at an 8.48% CAGR. IMARC Group, India Office Furniture Market, base year 2025
- Public capital expenditure in the Union Budget 2026-27 rose to Rs. 12.22 lakh crore (US$ 135.8 billion), from Rs. 10.96 lakh crore in FY25-26, with roughly Rs. 143 lakh crore of infrastructure spending planned across FY24 to FY30. IBEF, Infrastructure Sector in India, updated February 2026