BCAS-Cleared Airport ContractorIn-House Manufacturing & Civil ExecutionPan-India DeliveryGet a Quote ↗
Get a Project Quote →
💬 WhatsApp

General Contracting

MEP Contractor: Electrical, HVAC, Plumbing & Fire Fighting, All In-House

In-house MEP execution for commercial fit-outs, new construction, and standalone MEP-only projects. Electrical, HVAC, plumbing, and fire fighting under one project lead, with no vendor-to-vendor coordination on your plate.

In-house MEP teamElectrical, HVAC, plumbing & fire safetyNBC & IS code compliantMEP-only or full turnkeyPan-India + Gulf delivery

Last updated: 31 July 2026

MEP Works delivered by the Impulse Branding Solutions site team
4 disciplines
Electrical, HVAC, plumbing & fire, one team
Zero
Subcontracted MEP scopes
15+ years
Operating history

In Short

MEP covers mechanical, electrical and plumbing, and on an IBS contract fire fighting and life safety as well. All four disciplines are executed by one in-house team reporting to a single project lead, so a clash between a duct and a cable tray is settled on site that day instead of escalating between vendors. Fit-out, new build and MEP-only packages, across India.

MEP, mechanical, electrical, and plumbing works, is where most fit-out and construction projects lose time. When electrical, HVAC, plumbing, and fire safety are subcontracted to separate vendors, coordination between trades becomes the client's problem: nobody owns the interface where a cable tray crosses a duct run, or where a sprinkler head lands in a ceiling grid. Impulse Branding Solutions runs all four disciplines through one in-house MEP team. The same project lead who owns electrical also owns HVAC, plumbing, and fire safety, and coordinates directly with the civil team on fit-out projects, so clashes get resolved in a site meeting, not a change-order dispute.

Completed mep works handed over on an Indian commercial project
In-House, Design to InstallDesign, fabrication, electrical assembly and installation run under one roof.

What We Make

What does IBS's MEP scope cover?

India's public capital expenditure rose from about ₹2 Lakh Crore in FY2014-15 to ₹12.2 Lakh Crore in FY2026-27 (PIB, 2026). Services work is where a large share of that lands, because every terminal, hospital block, and office floor built against it needs power, air, water, and fire protection commissioned before anyone occupies it. IBS's MEP scope spans four disciplines, electrical, mechanical (HVAC), plumbing, and fire fighting, all delivered by one in-house team without subcontracting. Each discipline below can be engaged as part of a full turnkey fit-out or as a standalone MEP package for clients with their own civil contractor already appointed.

General Contracting · Type 01

Electrical Works

IBS's electrical scope runs from the LT panel room to the last light fixture. Our in-house electrical engineers design the single-line diagram, size the panels and cabling, and our electricians execute the installation, all to NBC and Central Electricity Authority (CEA) Regulations standards. Electrical rework after false ceiling and flooring are closed is one of the most expensive mistakes on a fit-out; our electrical team coordinates load calculations and point layouts before those trades start, not after.

  • LT panel design and installation: main distribution boards, sub-distribution boards, local distribution boards
  • Building wiring: concealed and surface wiring, cable tray routing, fire-rated cabling where specified
  • Lighting design: lux-level calculations by space type (general, task, accent, emergency), fixture selection and installation
  • Power points and data provisioning: coordinated with the IT cabling layout to avoid clashes at the workstation
  • UPS and DG integration: sizing, automatic transfer switches, change-over panel installation
  • Earthing and energy metering: earthing per IS code, sub-metering for tenant or department-wise billing
Electrical Works: MEP Works, Impulse Branding Solutions

General Contracting · Type 02

HVAC (Mechanical) Works

Air conditioning and ventilation account for the largest share of a commercial building's operating energy cost, so HVAC design discipline matters beyond day-one comfort. IBS's mechanical team designs and installs split, VRF/VRV, and chilled-water systems, sized to the actual heat load of the space rather than a generic per-square-foot rule of thumb, and commissions every system before handover.

  • Split and cassette AC: for cabins, small offices, and retail counters
  • VRF/VRV systems: for mid- to large-size commercial floor plates, zoned by usage pattern
  • Chilled water systems: for large floor plates and multi-building campuses
  • Ducting, diffusers and air distribution: sized to heat-load calculation, not estimated
  • Ventilation and exhaust: washroom exhaust, kitchen exhaust, basement and car-park ventilation
  • Server room and precision cooling: dedicated cooling for IT and data infrastructure
  • Commissioning and air balancing: every system is tested and balanced before handover
HVAC (Mechanical) Works: MEP Works, Impulse Branding Solutions

General Contracting · Type 03

Plumbing & Sanitation

Plumbing failures tend to surface months after handover, in a ceiling stain or a washroom that never quite drains right, which is why IBS treats plumbing design and pipe-slope discipline as seriously as the visible finish. Our plumbing team handles supply, drainage, and treatment as one coordinated scope, tested before the flooring goes down, not after.

  • Water supply: hot and cold supply lines, pressure-tested before commissioning
  • Drainage and sanitary systems: soil, waste, and vent lines to Indian Plumbing Code gradients
  • Washroom fit-outs: sanitaryware supply and installation, cubicle systems, waterproofing
  • Kitchen and pantry plumbing: for cafeterias, pantries, and F&B fit-outs
  • Water treatment: softeners, filtration, and RO systems sized to the building's water quality and occupancy
  • STP/ETP integration: sewage and effluent treatment works for buildings that require on-site treatment, to CPCB and local Pollution Control Board discharge norms
Plumbing & Sanitation: MEP Works, Impulse Branding Solutions

General Contracting · Type 04

Fire Fighting & Life Safety

Fire safety is the one MEP discipline where a coordination gap is not just expensive, it is dangerous, and it is also the discipline most often bolted on late by contractors who treat it as a compliance checkbox rather than an engineered system. IBS designs and installs fire fighting systems as part of the core MEP scope, coordinated with the ceiling and electrical layout from day one, and coordinates fire NOC approval with the local fire authority as part of project delivery.

  • Sprinkler systems: wet-riser and sprinkler head layout, coordinated with false ceiling and HVAC ducting to avoid clashes
  • Fire hydrant and hose reel systems: internal and external hydrant networks per NBC Part 4
  • Fire detection and alarm: smoke and heat detectors, addressable fire alarm panels, integration with building management systems
  • Fire pump rooms: jockey pump, main pump, and standby pump sets sized to the building's fire load
  • Fire NOC coordination: documentation and liaison with the local fire authority (in Mumbai, MCGM Fire Brigade) through to approval
Fire Fighting & Life Safety: MEP Works, Impulse Branding Solutions

Specification

What codes and materials does IBS's MEP work follow?

Every MEP installation IBS executes is designed and tested to recognised Indian codes, not informal trade practice. Below are the codes, typical material brands, and quality checks that anchor MEP execution quality.

Engineering & compliance codes

  • National Building Code (NBC) 2016: Part 4 (Fire and Life Safety) and Part 8 (Building Services) are the primary references for MEP design
  • IS 732: code of practice for electrical wiring installations
  • CEA Regulations, 2010 and Indian Electricity (IE) Rules: safety of electrical works and installations
  • Indian Plumbing Code (IPC): pipe sizing, gradient, and sanitation standards for plumbing and drainage
  • ISHRAE guidelines: heat-load calculation and HVAC design practice referenced for larger commercial systems
  • Fire NOC compliance: site-specific clearance from the local fire authority (in Mumbai, MCGM Fire Brigade)

Typical material specification brands

  • Electrical switchgear: Schneider / Siemens / Legrand
  • Cabling: Polycab / Havells / Finolex
  • HVAC: Daikin / Voltas / Hitachi VRV/VRF systems
  • Building management systems: Honeywell / Siemens BMS integration
  • Fire detection: Tyco / Honeywell / Apollo detection systems; UL-listed sprinkler heads
  • Piping: ISI-marked CPVC and UPVC piping (Astral / Finolex / Supreme, per BOQ specification)
  • Final spec is agreed at drawing-approval stage and locked to the BOQ. Substitutions only with written client approval.

Testing & commissioning

  • Electrical: insulation resistance tests, megger tests on all circuits before energisation
  • HVAC: commissioning and air balancing, refrigerant leak testing
  • Plumbing: hydrotesting of all supply and drainage lines before flooring closure
  • Fire fighting: sprinkler pressure tests, fire pump performance tests, alarm system functional tests
  • Documentation: test certificates issued at handover for every discipline, forming part of the as-built record

Ready when you are

Send the drawings, get a scoped quote.

Share the site, the scope and the date you need it working. We quote against a BOQ with every component itemised, and the first site visit carries no charge.

How We Deliver

From brief to handover.

A standalone MEP project typically spans four to twelve weeks depending on scope and building size; MEP integrated into a full fit-out follows the fit-out's own four-to-sixteen-week timeline. The process below is what IBS follows on every MEP engagement, standalone or integrated.

  1. Load assessment & site survey

    Our MEP coordinator and discipline leads (electrical, HVAC, plumbing, fire) walk the site to capture existing services, available capacity (incoming electrical load, water supply pressure, fire hydrant network), and any constraints. For new construction, this stage works from architectural drawings instead of a physical site.

  2. MEP design & drawing coordination

    Single-line electrical diagrams, HVAC layout and heat-load calculations, plumbing isometrics, and fire safety layout are developed together, not in isolation, so clashes (a duct crossing a cable tray, a sprinkler head over a light fixture) are caught on the drawing, not on site. A coordinated services drawing is issued for approval before procurement begins.

  3. BOQ, procurement & mobilisation

    Material brands and specifications are locked to the BOQ at this stage. Panels, cabling, HVAC equipment, piping, and fire safety equipment are procured against the approved drawing, and the site team mobilises within an agreed window.

  4. First fix: conduiting, ducting & piping

    Cable trays and conduits, HVAC ducting, and plumbing lines are routed and installed before walls and ceilings close in. This is the stage where cross-discipline coordination matters most, and where a single MEP team avoids the clashes that multi-vendor projects discover only after the ceiling grid is up.

  5. Equipment installation

    LT panels, HVAC indoor and outdoor units, fire pumps, sprinkler heads, and sanitary fixtures are installed once first-fix works are complete and inspected.

  6. Testing & commissioning

    Megger tests on every electrical circuit, hydrotesting on every plumbing line, air balancing on every HVAC system, and pressure testing on the fire fighting system. Nothing is handed over untested.

  7. Fire NOC, statutory approvals & handover

    Fire NOC inspection coordination with the local fire authority, final testing sign-off, and handover documentation: as-built drawings, test certificates, and O&M manuals for every discipline.

Why Buyers Choose IBS

Built in-house. Owned outright.

Most MEP work in India is subcontracted trade by trade: one vendor for electrical, another for HVAC, a third for plumbing, a fourth for fire fighting, and the client absorbs every coordination gap between them. IBS runs all four as one in-house team. The advantage shows up in fewer site clashes, faster snag closure, and one point of accountability when something needs fixing.

01

One MEP team, four disciplines

Electrical, HVAC, plumbing, and fire safety report to the same MEP coordinator and the same project lead. Cross-discipline conflicts, a cable tray crossing a duct run, a sprinkler head landing on a light fixture, get resolved in a site walk, not an email chain between four different companies.

02

MEP-only or integrated with the fit-out

IBS can take MEP as a standalone package for clients who already have a civil contractor or fit-out vendor, or as one integrated scope alongside civil, ceiling, flooring, and joinery. Either way, the same in-house MEP team and testing discipline applies.

03

Testing and commissioning as standard, not an add-on

Every electrical circuit is megger-tested, every plumbing line is hydrotested, every sprinkler system is pressure-tested, before handover. Test certificates are issued as part of the handover packet, not produced only if asked for.

04

Fire NOC and statutory approval coordination

Fire safety design and installation is coordinated with fire NOC filing and local fire authority liaison as part of the project scope, so the fire fighting system that gets installed is the one that gets approved, not a redesign after a failed inspection.

05

Pan-India and Gulf delivery

IBS has delivered MEP works across Mumbai, Pune, Delhi NCR, Bengaluru, Hyderabad, Chennai, Kolkata, and Tier 2 cities, and serves Gulf countries including the UAE, Saudi Arabia, Oman, Qatar, and Kuwait. Site teams and procurement are coordinated centrally from the Mumbai base.

IBS in-house team at work on a mep works project

How does in-house MEP compare with four separate services vendors?

Electrical, HVAC, plumbing, and fire fighting are normally awarded to four different contractors, which leaves every cross-trade interface unowned. Here is how that compares with a single in-house MEP team.

How does in-house MEP compare with four separate services vendors?
Typical Multi-Vendor ApproachIBS Integrated Approach
Who owns a cross-trade clashNobody owns the point where a cable tray crosses a duct run or a sprinkler head lands in a ceiling grid; it becomes a change-order disputeElectrical, HVAC, plumbing, and fire safety report to the same MEP coordinator, so a clash is resolved in a site meeting
Testing and commissioningQuoted and billed as an additional line item, sometimes compressed or skipped when the programme tightensMegger testing on every circuit, hydrotesting on every plumbing line, and sprinkler pressure testing built into every handover
Fire NOC and statutory approvalLeft with the client or the architect to file and chase separately from the installationFire safety design and installation coordinated with fire NOC filing and local fire authority liaison as part of the scope
Engaging MEP without the civil packageServices vendors often price MEP only as part of a full fit-out awardMEP can be taken as a standalone package where a civil contractor is already appointed, or integrated with the full fit-out
Delivery outside the home cityA new set of local subcontractors appointed per city, with the specification reinterpreted each timeDelivered across Mumbai, Pune, Delhi NCR, Bengaluru, Hyderabad, Chennai, Kolkata, Tier 2 cities, and the Gulf

Sectors We Serve

Where this work lands.

IBS's MEP portfolio spans commercial, healthcare, hospitality, industrial, retail, and government projects, each with its own load profile and compliance overlay. Below are the sectors where MEP-specific requirements shape how we scope and deliver.

Commercial Buildings & IT Parks: MEP Works, Impulse Branding Solutions

Commercial Buildings & IT Parks

Office towers and IT parks carry high data and power density per seat, UPS backup expectations, and round-the-clock uptime requirements for server rooms. IBS's electrical and HVAC teams size panels and cooling capacity for actual occupancy load, not a generic per-square-foot estimate.

See corporate office projects
Hospitals & Healthcare Facilities: MEP Works, Impulse Branding Solutions

Hospitals & Healthcare Facilities

Healthcare MEP carries the highest compliance bar of any building type: isolated power circuits for critical equipment, medical gas provisioning coordination, and ventilation standards for clinical areas. IBS's healthcare fit-out projects are delivered with MEP specified to NABH and AERB-adjacent standards where required.

See healthcare projects
Hotels & Hospitality: MEP Works, Impulse Branding Solutions

Hotels & Hospitality

Hospitality MEP has to stay invisible to the guest and reliable around the clock: kitchen exhaust and grease-trap systems, guest-room HVAC zoning, and backup power for life-safety systems during outages. Phased execution for operating properties is a common requirement.

See hospitality projects
Industrial Facilities: MEP Works, Impulse Branding Solutions

Industrial Facilities

Industrial MEP scopes carry higher electrical loads, process ventilation, and often effluent treatment requirements that commercial buildings do not. IBS's electrical and plumbing teams size for the actual process load, not a standard commercial baseline.

Retail Chains & Malls: MEP Works, Impulse Branding Solutions

Retail Chains & Malls

Retail MEP has to work within tight mall-imposed timelines and landlord technical guidelines, often executed in parallel with fit-out and signage works across multiple stores simultaneously. Rollout consistency across locations matters as much as individual site quality.

See retail projects
Government Buildings: MEP Works, Impulse Branding Solutions

Government Buildings

Government and PSU MEP projects come with their own procurement, documentation, and compliance processes: L1 tendering, EMD requirements, and performance bank guarantees, which IBS's project documentation team is set up to handle.

Commercials

Commercial framework

IBS's commercial engagement for MEP works is structured around three pillars: a locked-down scope captured in coordinated services drawings and a BOQ; named-material specifications with no surprise substitutions; and warranty terms that survive handover. Specific pricing and stage-wise payment terms are agreed in the proposal and contract, not published here.

What a quotation covers3 clauses

Scope, BOQ & spec lock-down

The commercial relationship is anchored on the coordinated services drawing and BOQ. Every discipline line, material brand, equipment capacity, and quantity is itemised. Scope changes during execution are tracked through a written change-order log with cost and timeline impact noted before approval.

Taxes: GST on the IBS invoice

IBS invoices for MEP works attract GST at the applicable rate per the prevailing GST Council notification. GST is shown on a separate line in every invoice, with tax certificates issued. Input tax credit availability, where applicable to your business, applies as standard.

Warranty & defect liability

IBS provides written warranty on every MEP discipline, with manufacturer warranty passed through separately on equipment. Warranty cards and test certificates form part of the handover packet.

Warranty terms by discipline
DisciplineTerm
Electrical installationtwelve months on installation, with manufacturer warranty pass-through on switchgear and equipment
HVAC installationtwelve months on installation, with manufacturer warranty pass-through on VRF/VRV and AC equipment
Plumbing installationtwelve months on workmanship, with manufacturer warranty on fixtures and treatment equipment
Fire fighting systemstwelve months on installation, with manufacturer warranty pass-through on pumps and detection equipment
No charge, no obligation

Site survey & feasibility

The initial site visit and load assessment is provided without charge and without obligation. Detailed MEP design and coordinated services drawings, where engaged through IBS rather than your appointed consultant, are a separate scope itemised in the proposal.

Request a Site Survey

Questions

Everything procurement heads, project managers, and admin teams ask before commissioning

Cost & Billing

What does MEP work cost in India?
MEP cost depends on scope, equipment specification, building size, and site conditions. There is no meaningful per-square-foot answer without a site survey and load assessment. IBS provides a detailed, itemised BOQ-based quotation within 48 to 72 hours of the initial site visit.
Does the price include GST?
GST is shown on a separate line in every IBS invoice at the applicable rate per the prevailing GST Council notification, not bundled into the line-item price. Tax invoices and certificates are issued for every billing event.
How do I get a quotation for MEP work?
Share your scope, drawings if available, building size, and location through the enquiry form on this page, by phone, or by WhatsApp. IBS will respond with an itemised BOQ-based quotation within 48 to 72 hours, faster for straightforward requirements.

Timelines

How long does an MEP project take?
A standalone MEP project typically spans four to twelve weeks depending on building size and scope. MEP integrated into a full fit-out follows the fit-out's own four-to-sixteen-week timeline. A confirmed schedule is provided at the quotation stage based on your specific scope.

Warranty & Service

What warranty does IBS provide on MEP work?
Electrical, HVAC, plumbing, and fire fighting installations each carry twelve months of workmanship warranty from handover, with manufacturer warranty on equipment (switchgear, VRF/AC units, fixtures, pumps) passed through separately. Warranty cards and test certificates form part of the handover packet.

Scope & Handover

What does MEP stand for and what does it include?
MEP stands for Mechanical, Electrical, and Plumbing, the three core building services disciplines, plus fire fighting and life safety systems, which IBS includes as part of the same integrated scope. Together these cover everything from LT panels and lighting to HVAC, water supply, drainage, and sprinkler systems.
Is testing and commissioning included, or billed separately?
Testing and commissioning is included as standard on every MEP project: megger tests on electrical circuits, hydrotesting on plumbing lines, air balancing on HVAC systems, and pressure testing on fire fighting systems. Test certificates are issued at handover as part of the standard packet, not billed as an extra.
What happens if MEP scope changes mid-project?
Scope changes, whether client-driven or discovered on site, are tracked through a written change-order log. Cost and timeline impact are documented and approved before execution, which prevents the silent scope creep that is the most common source of disputes on MEP projects.

Compliance

How does IBS handle fire NOC approval?
Fire fighting systems, sprinklers, hydrants, detection, and alarm, are designed and installed to NBC Part 4 standards, and IBS coordinates fire NOC documentation and inspection liaison with the local fire authority (in Mumbai, MCGM Fire Brigade) as part of the project scope, through to approval.

Technical

Why is an in-house MEP contractor better than subcontracting each trade separately?
When electrical, HVAC, plumbing, and fire fighting are subcontracted to four separate vendors, each vendor protects its own scope and nobody owns the interface between them: a duct crossing a cable tray, a sprinkler head over a light fixture. With IBS's in-house MEP team, one coordinator and one project lead own all four disciplines, so clashes get resolved on site instead of in a dispute between vendors.
Can IBS execute MEP-only projects without the full fit-out?
Yes. IBS takes MEP as a standalone package for clients who have a separate civil contractor or fit-out vendor already appointed. The same in-house team, testing discipline, and warranty terms apply whether MEP is standalone or integrated into a full turnkey fit-out.
Does IBS execute MEP projects across India, or only in Mumbai?
IBS is headquartered in Mumbai and has delivered MEP works across Mumbai, Pune, Delhi NCR, Bengaluru, Hyderabad, Chennai, Kolkata, and Tier 2 cities, as well as Gulf countries including the UAE, Saudi Arabia, Oman, Qatar, and Kuwait. Site teams are mobilised centrally from the Mumbai base.
What HVAC systems does IBS install?
IBS designs and installs split and cassette AC for cabins and small offices, VRF/VRV systems for mid-to-large commercial floor plates, and chilled-water systems for large floor plates and multi-building campuses. System selection is based on heat-load calculation for the specific space, not a generic per-square-foot rule.
Does IBS handle UPS and DG set sizing and integration?
Yes. UPS system sizing, diesel generator set integration, automatic transfer switches, and change-over panel installation are part of the electrical scope, sized to your actual backup power requirement.
How is the MEP BOQ structured?
The BOQ itemises every discipline line by line: electrical (panels, cabling, lighting, UPS/DG), HVAC (equipment, ducting, commissioning), plumbing (supply, drainage, treatment), and fire fighting (sprinklers, pumps, detection). Material brand, capacity, quantity, and rate are shown per line, so there are no surprises mid-project.
Does IBS have experience with government and PSU MEP projects?
Yes. IBS has executed projects for PSU clients, government bodies, and institutional organisations. Government procurement processes, L1 tendering, EMD requirements, and performance bank guarantees are standard operating procedure for our team.
How does IBS coordinate MEP with a client's own civil contractor?
When IBS is engaged for MEP only, our MEP coordinator works directly against the civil contractor's drawings and site schedule, attending joint site coordination meetings to flag clashes early. When IBS handles both civil and MEP, this coordination happens inside one team instead of between two companies.

The Company

About Impulse Branding Solutions

Impulse Branding Solutions is a Mumbai-headquartered, vertically integrated commercial branding and fit-out execution company with over fifteen years of operating history. We deliver across two service lines under one roof: print branding and signage, including ACP cladding, LED sign boards, glow signs, channel letters, vehicle wraps and exhibition fabrication, and commercial interior fit-outs covering civil, MEP, false ceiling, joinery and turnkey contracting.

Our in-house manufacturing facility, in-house civil and engineering team and in-house furniture factory near Vasai East mean every project, from a single signage installation to a multi-Crore fit-out, runs through one team with single-point accountability. Approved vendor with Adani Airports, HSBC, Reliance Retail, HDFC ERGO, Godrej Finance, EPSON and Duravit. BCAS-cleared for airport work. Pan-India delivery at a single execution pace.

Read more about IBS

Track Record

Who you are buying from.

Delivery Team

A senior, in-house project team

Civil, MEP, and joinery leads supporting enterprise fit-out and branding projects across India.

“Every project runs under one accountable team, from site survey to final handover.”

Why IBS

  • 15+ years executing branding and fit-out projects
  • Pan-India delivery: single execution pace
  • BCAS clearance for airport work
  • In-house civil and engineering team: no subcontracted substructure
  • In-house furniture factory near Vasai East: workstations, conference tables and case goods
  • Approved vendor with Adani Airports, HSBC, Reliance Retail, EPSON, Duravit

Approved Vendor & Credentials

Company-level BCAS security clearance for airport projects; site access arranged per assignment

Approved vendor with

Adani Airports · HDFC ERGO · Reliance Retail · Godrej Finance · EPSON · Duravit · HSBC

Past clients

Accessorize · Adani Airports · Aditya Birla Retail · Duravit · EPSON · Godrej Finance · HDFC ERGO · HSBC · Reliance Retail · Sagility · Society Tea

References

Sources and standards

  • The IS codes referenced on this page, including IS 3043 for earthing and IS 732 for electrical installation, are issued by the Bureau of Indian Standards. Specifications quoted here can be checked against the published standard. Bureau of Indian Standards, the issuing authority
  • Public capital expenditure in the Union Budget 2026-27 rose to Rs. 12.22 lakh crore (US$ 135.8 billion), from Rs. 10.96 lakh crore in FY25-26, which sets the volume of institutional and commercial construction that follows it. IBEF, Infrastructure Sector in India, updated February 2026

Ready to Start?

Ready to scope your MEP project?

Request a no-obligation site visit and load assessment. Our MEP coordinator and discipline leads will assess your requirement and follow up with a detailed BOQ within 48 to 72 working hours.

Request an MEP quote

Request an MEP quote

Tell us about your mep works requirement.