Airports / Aviation · Pan-India

Adani Airports

Airport Terminal Wayfinding & Signage — BCAS Clearance Project

BCAS-cleared. Airside and landside. In-house.

BCASClearance held
8 wksExecution
100%In-house install
Adani Airports — Airport Terminal Wayfinding & Signage — BCAS Clearance Project

The Challenge

What the project needed to solve

BCAS Security Clearance Requirement

Airport terminal work — airside in particular — requires Bureau of Civil Aviation Security (BCAS) clearance for all personnel and contractors on site. Most branding agencies cannot operate in this environment.

Operational Airport — Zero Disruption

The terminal remained fully operational during the signage installation. Every work window had to be coordinated with airport operations for safety and schedule compliance.

System Consistency Across All Zones

Wayfinding must function as a unified visual system — check-in, security, gate areas, retail, and landside pickup — with consistent typography, contrast ratios, and placement heights.

Our Approach

How Impulse Branding executed it

01

IBS's existing BCAS clearance meant no delays for security vetting — a common bottleneck for airports when engaging contractors without prior clearance.

02

The wayfinding system was designed to DGCA and ICAO wayfinding guidelines, with high-contrast colour coding and standardised mounting heights tested for visibility from 10 metres.

03

Installation was executed across controlled windows — early mornings and post-midnight — coordinated with Adani airport operations teams.

The Outcome

Results delivered

Project Outcome

Complete wayfinding and signage system installed and operational within the 8-week programme. Zero operational disruptions recorded. IBS is retained on the Adani Airports preferred vendor panel for subsequent projects.

Services Used

What we delivered on this project

Airport Fit-OutsWayfinding SignageLED Sign BoardsRetail FasciaLandside Branding